Jumping Pillow with triple membrane system, joint-less pipework, motor-blower, lockable steel cabinet, non-degrading anchor system and safety signs.
You just choose your preferred method of installation.
Assisted Installation
Engage your own earthworks contractor to do the groundworks.
You will need a 3 – 5 tonne digger with driver.
We provide the Jumping Pillow Kit and our installation team technicians to install and commission the Jumping Pillow.
Includes standard safety signage.
Full Installation
We will arrange everything for you and provide all the materials, plant and staff for the complete installation.
Includes bespoke safety signage.
Safety Surface
You will need to decide on the attenuating surface for the safety perimeter surrounding the Jumping Pillow.
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.